刮膩?zhàn)右话銊?wù)必1-3次竟块,因而膩?zhàn)訉泳蜁?huì)有1-3層,許多小區(qū)業(yè)主尋找七婴,自己家墻體的膩?zhàn)映33霈F(xiàn)了脫層的今日祟偷,那么這是什么原因?怎么處理呢打厘?下面
濟(jì)南膩?zhàn)臃?/a>廠家為您解答修肠。
It is generally necessary to apply putty for 1-3 times, so there will be 1-3 layers of putty. Many community owners look for putty, and the putty of their own walls often appears delamination today. So what is the reason? How to deal with it? Now Jinan putty powder manufacturer will answer for you.
產(chǎn)生原因:
Cause:
1、由于使用的耐水膩?zhàn)臃蹖儆诼谛突Фⅲ?dāng)前一道產(chǎn)品批刮在墻上時(shí)會(huì)隨著時(shí)間的延長或受天氣潮濕嵌施、遇水均會(huì)增加其硬度,施工時(shí)前一道與后一道批刮施工的時(shí)間間隔較久莽鸭,當(dāng)后一道施工完以后即開始打磨吗伤,外層較松,較易打磨硫眨,當(dāng)有些地方磨穿到前一道時(shí)足淆,由于前一道放置的時(shí)間較久,較硬织岁,不易打磨赃织,所以磨出來墻面兩種不同的效果,就會(huì)形成類似分層的現(xiàn)象。
1. As the water resistant putty powder used is slower than the type, the hardness of the current product will increase with the extension of time when it is scraped on the wall or when it is wet or wet. During the construction, the time interval between the previous and the next batch is long. When the latter is completed, it will start to polish. The outer layer is loose and easy to polish. When some parts are worn through to the previous layer, the previous layer will be placed for a long time and hard, It is not easy to polish, so two different effects on the wall surface will form a similar layered phenomenon.
2氨筑、在批刮后一道時(shí)壓的太實(shí)够煮、收的太光滑、時(shí)間間隔較久而受天氣潮濕瑰齐、遇水等影響就會(huì)形成外層表膜與表層的硬度不同弟茸,當(dāng)打磨時(shí),由于表膜與表層的硬度不同仔醒,里層較松版叁,容易被磨深,而表膜硬度較高水惑,不易打磨塌自,就會(huì)形成分層現(xiàn)象。
2. After batch scraping, the hardness of the outer surface film will be different from that of the surface layer due to the influence of damp weather, water and other factors such as too solid pressure, too smooth finish and long time interval. When grinding, the inner layer is loose and easy to be worn deep due to the different hardness of the surface film and the surface layer, while the hardness of the surface film is high and not easy to be polished, which will result in delamination.
![濟(jì)南膩?zhàn)臃? src=]()
處理方法:
Handling method:
1汽足、前一道施工完以后悟旧,因其它原因無法一次施工完整而導(dǎo)致的時(shí)間間隔較久,或因遇天氣潮濕减拭、雨季蔽豺、遇水等原因;建議其在接下來施工時(shí)應(yīng)批刮兩道膩?zhàn)臃叟》啵@樣即可避免在打磨時(shí)會(huì)磨破底而產(chǎn)生的脫層現(xiàn)象修陡。
1. After the completion of the previous construction, the time interval is long because the construction cannot be completed at one time due to other reasons, or due to wet weather, rainy season, water and other reasons; It is suggested that two layers of putty powder should be applied during the next construction, so as to avoid the delamination caused by the bottom being worn down during polishing.
2、批刮起后一道時(shí)應(yīng)注意不要壓的太實(shí)可霎,需打磨的墻面不能收光魄鸦,將表面的針孔、刀痕收平即可癣朗,若遇潮濕天氣(俗稱水南天)拾因、雨季應(yīng)暫停作業(yè),等天氣好轉(zhuǎn)時(shí)方可作業(yè)旷余。如已批刮完后一道時(shí)遇到潮濕天氣绢记、下雨的應(yīng)隔天隨即打磨,避免因墻面表膜吸水回硬而產(chǎn)生的打磨脫層現(xiàn)象正卧。
2. When scraping the next layer, care should be taken not to press it too tightly. The wall surface to be polished should not be polished, and the pinholes and knife marks on the surface should be flattened. In case of wet weather (commonly known as Shuinantian) and rainy season, the operation should be suspended, and the operation can only be started when the weather improves. In case of wet weather or rain after scraping, polish immediately the next day to avoid polishing delamination caused by water absorption and hardening of wall surface film.
注:1蠢熄、壓實(shí)、拋光后的墻面不宜打磨茅早;
Note: 1. The wall surface after compaction and polishing should not be polished;
2敞冤、雨季或潮濕天氣應(yīng)停止作業(yè),特別是山區(qū)的地方天氣情況多變肘论,應(yīng)特別注意崭甩。
2. Operation shall be stopped in rainy season or wet weather, especially in mountainous areas where the weather is changeable.
3沙书、耐水膩?zhàn)臃凼┕ず笤谡5那闆r下應(yīng)在一星期以內(nèi)打磨較佳。
3. Water resistant putty powder shall be polished within one week under normal conditions after construction.
膩?zhàn)用搶邮鞘裁丛蛴淌ǎ可线厼榇蠹医庾x了膩?zhàn)用搶拥脑蚣敖鉀Q方式,膩?zhàn)用搶拥迷捯畛_裂層叹惕,新的采用膩?zhàn)优幭洳兀⒁馊滥佔(zhàn)庸こ痰拈g距。更多相關(guān)內(nèi)容就來我們網(wǎng)站
http://www.bjtsdc.com進(jìn)行咨詢吧随巴!
What is the cause of putty delamination? The reasons and solutions for the putty delamination are explained above. If the putty delamination is required, the cracked layer shall be removed. The new putty shall be used for plastering. Pay attention to the spacing of the three putty works. More relevant content will come to our website http://www.bjtsdc.com Consult!