日韩黄色一级大片,日韩专区在线,日韩在线aⅴ免费视频,国产日韩欧美一区二区三区在线 - www.bjtsdc.com

歡迎您瀏覽濟南巨野河福華建材廠,主營:濟南膩子粉,濟南石膏粉,濟南抹面砂漿等建筑裝飾材料,大量批發(fā),歡迎咨詢。

專注綠色建筑裝飾材料

經營管理理念:讓客戶用的放心!

24小時服務熱線:

13864111871

當前位置: 首頁 - 新聞動態(tài) > 行業(yè)資訊
行業(yè)資訊
聯系我們

濟南福華建材廠

聯系人:吳老師 

電話:13864111871 

手機:13864111871
          0531-81901300
地址:山東省濟南市高新開發(fā)區(qū)巨野河辦事處山圈村西


抹面砂漿施工后需要養(yǎng)護嗎倚评?

來源:http://www.bjtsdc.com 日期:2023-03-13 發(fā)布人:

抹面砂漿在施工后需要馬上保養(yǎng)讽渐,保養(yǎng)需要留意施工時的溫度,在依據溫度的狀況確認保養(yǎng)時需要準備的材料佳绩,此外也是有無需保養(yǎng)的產品,濟南抹面砂漿具體保養(yǎng)條件如下所示:
The plastering mortar needs to be maintained immediately after construction. The maintenance needs to pay attention to the temperature during construction. The materials to be prepared for maintenance should be confirmed according to the temperature condition. In addition, there are products that need to be maintained. The specific maintenance conditions of Jinan plastering mortar are as follows:
冬天施工日平均氣溫小于5°C時要按冬天施工并滿足以下規(guī)定:
When the daily average temperature of winter construction is less than 5 ° C, the construction shall be carried out in winter and meet the following requirements:
1.施工前要采取一定的有效措施加熱基礎表層,使其溫度維持在KTC以上捻撑,并清理存水。
1. Before construction, certain effective measures shall be taken to heat the surface layer of the foundation, maintain its temperature above KTC, and clean up the water.
2.受冷前惜互,水泥基工程材料的抗壓程度不可小于6MPa布讹。
2. Before being cooled, the compressive strength of cement-based engineering materials shall not be less than 6MPa.
高溫氣候環(huán)境施工施工位置溫度超過37°C,應按高溫氣候延緩施工并滿足以下規(guī)定:
If the temperature of the construction site in the high-temperature climate exceeds 37 ° C, the construction shall be delayed according to the high-temperature climate and meet the following requirements:
1.施工前24小時采取一定的有效措施训堆,避免施工位置受到遭受直射或別的輻射熱描验。
1. Take certain effective measures 24 hours before construction to avoid direct radiation or other radiant heat at the construction site.
濟南抹面砂漿
2.采取適度減溫措施,與水泥基工程材料接觸的混凝土基礎和設備底板的溫度不可超過37°C坑鱼。
2. Take appropriate temperature reduction measures, and the temperature of concrete foundation and equipment base plate in contact with cement-based engineering materials shall not exceed 37 ° C.
3.料漿的入模溫度不可超過35°C帘染。
3. The injection temperature of slurry shall not exceed 35 ° C.
4.施工后應及時采取補濕保養(yǎng)措施。
4. Moisturizing and maintenance measures shall be taken in time after construction.
免保養(yǎng)條件如下所示:
The maintenance-free conditions are as follows:
施工溫度超過5°小于37°時谅璧,基礎施工后無需保養(yǎng)耕疟。超過溫度范圍應遵循抹面砂漿施工保養(yǎng)方法實行保養(yǎng)。
When the construction temperature is more than 5 ° and less than 37 °, no maintenance is required after the foundation construction. If the temperature exceeds the range, the plastering mortar construction and maintenance methods shall be followed.
冬天保養(yǎng)需要準備的材料:棉被拆鹉、薄膜這些材料主要是為了保溫上互,因為冬天溫度過低,因此需要做好保溫防范準備
Materials to be prepared for winter maintenance: cotton quilt and film are mainly used for heat preservation. Because the temperature is too low in winter, it is necessary to prepare for heat preservation
夏天保養(yǎng)需要準備的材料:薄膜舷翰,薄膜主要是為了補濕匀冈,預防水分的太早外流造成產品施工內部無法牢固,此外一定要按時灑水坐蓉,灑水的也是為了補濕郁秦,因為在施工后內部反應需要大量水分喘茵。
Materials to be prepared for maintenance in summer: film, which is mainly used to supplement moisture, to prevent water from flowing out too early and causing the internal construction of the product to be unstable. In addition, it is necessary to sprinkle water on time, which is also used to supplement moisture, because a large amount of water is required for internal reaction after construction.
針對抹面砂漿施工后需要養(yǎng)護嗎這個問題,我們就講解到這里了能说,您對此有怎樣的疑惑或者需求丈轻,歡迎隨時咨詢聯系我們http://www.bjtsdc.com
For the question of whether the plastering mortar needs to be cured after construction, we will explain it here. If you have any doubts or needs about it, please contact us at any time http://www.bjtsdc.com 绎谦!

???