刮膩子過程中的很多細(xì)小問題往往會被大家忽略,從而導(dǎo)致后期膩子出現(xiàn)起皮钮瘪、鼓包、裂紋等現(xiàn)象,所以為了避免日后出現(xiàn)這些問題伟阔,在刮膩子的過程中有些細(xì)節(jié)是不能被忽略的,這里濟南膩子粉廠家就和大家一起探討下刮膩子過程中會出現(xiàn)的一些問題掰伸。
Many small problems during the process of putty application are often overlooked, leading to peeling, bulging, cracks, and other phenomena in the later stage of putty application. Therefore, in order to avoid these problems in the future, some details cannot be ignored during the putty application process. Here, Jinan putty powder manufacturer will discuss with you some of the problems that may occur during the putty application process.
01
01
針孔
pinhole
產(chǎn)生原因
Cause of occurrence
1皱炉、批刮道時出現(xiàn)針孔屬于正常現(xiàn)象狮鸭。因為道在批刮時膩子粉層較厚合搅,且不宜收平,收太平以后將會影響第二道的附著力歧蕉。二画了、三道出現(xiàn)針孔的一般會是一些墻面較為凹凸不平的地方,由于凹凸不平的地方吃料比較多憎唯,比較慢干茬蓝,刮刀較難將凹的地方膩子粉層壓實,因而會產(chǎn)生一些針孔現(xiàn)象筛粘。
1. The occurrence of pinholes during the first batch scraping is a normal phenomenon. Because the first layer of putty powder is thicker during batch scraping and should not be flattened, it will affect the adhesion of the second layer after leveling. 2桐夭、 The three places where pinholes appear are generally some uneven areas on the wall. Due to the large amount of food consumed in these areas, they are slow to dry, and it is difficult for the scraper to compact the putty powder layer in the concave areas, resulting in some pinhole phenomena.
2、由于施工時光線不足會導(dǎo)致施工人員在施工時對墻面上一些較為小的針孔忽略熊倡,未及時收平而導(dǎo)致的一些針孔現(xiàn)象搅谆。
2. Due to insufficient construction time, construction personnel may overlook some relatively small pinholes on the wall during construction and fail to flatten them in a timely manner, resulting in some pinhole phenomena.
處理方法
processing method
1、對于凹凸不平的墻面應(yīng)該在道施工時應(yīng)盡量補平(因為道產(chǎn)生細(xì)微的針孔不會影響第二道的正常施工)這樣有利于批刮第二讳帆,三道膩子粉層時收平阀温,減少針孔的產(chǎn)生。
1. For uneven walls, it is advisable to make up for them as much as possible during the first construction (as the first layer produces fine pinholes that do not affect the normal construction of the second layer), which is beneficial for leveling the second and third layers of putty powder and reducing the generation of pinholes.
2置狠、在施工時應(yīng)注意光線啡笑,如遇天氣不好時光線不足或傍晚時光線由亮轉(zhuǎn)暗時,應(yīng)在有照明設(shè)備的幫助下進行施工黄鳍,避免因施工失誤而造成人為的針孔問題推姻。
2. During construction, attention should be paid to lighting. In case of poor weather or when the lighting changes from light to dark in the evening, construction should be carried out with the help of lighting equipment to avoid artificial pinhole problems caused by construction errors.
注:膩子粉粘度較高或比較慢干也會產(chǎn)生一些針孔現(xiàn)象,應(yīng)注意產(chǎn)品配方的合理性框沟。
Note: Putty powder with high viscosity or slow drying can also produce some pinholes, and attention should be paid to the rationality of the product formula.


02
02
脫層
Delamination
產(chǎn)生原因
Cause of occurrence
1藏古、有些公司生產(chǎn)的膩子粉屬于慢干型,當(dāng)前一道產(chǎn)品批刮在墻上時會隨著時間的延長或受天氣潮濕忍燥、遇水均會增加其硬度拧晕,施工時前一道與后一道批刮施工的時間間隔較久隙姿,當(dāng)后一道施工完以后即開始打磨,外層較松厂捞,較易打磨输玷,當(dāng)有些地方磨穿到前一道時,由于前一道放置的時間較久蔫敲,較硬饲嗽,不易打磨,所以磨出來墻面兩種不同的效果奈嘿,就會形成類似分層的現(xiàn)象貌虾。
1. Some companies produce putty powder that belongs to the slow drying type. When the current batch of products is scraped on the wall, its hardness will increase over time, or when it is exposed to damp weather or water. During construction, the interval between the previous and subsequent batches of scraping construction is relatively long. After the latter construction is completed, polishing begins. The outer layer is loose and easy to polish. When some areas are worn through to the previous layer, the previous layer is hard due to being left for a long time, It is not easy to polish, so grinding out two different effects on the wall will form a phenomenon similar to layering.
2、在批刮后一道時壓的太實翰蛔、收的太光滑革秩、時間間隔較久而受天氣潮濕、遇水等影響就會形成外層表膜與表層的硬度不同痰汰,當(dāng)打磨時焦赋,由于表膜與表層的硬度不同,里層較松凑戏,容易被磨深鲁磺,而表膜硬度較高,不易打磨裆机,就會形成分層現(xiàn)象跋园。
2. After the batch scraping, if the pressure is too firm, the collection is too smooth, and the time interval is too long, it will be affected by weather humidity, water, and other factors to form a different hardness between the outer surface film and the surface layer. When polishing, due to the different hardness between the surface film and the surface layer, the inner layer is loose and easy to be worn deep, while the surface film has a higher hardness and is not easy to polish, resulting in the formation of layering phenomenon.
處理方法
processing method
1、前一道施工完以后狼憋,因其它原因無法一次施工完整而導(dǎo)致的時間間隔較久息栖,或因遇天氣潮濕、雨季奖瞳、遇水等原因鹿蜀;建議其在接下來施工時應(yīng)批刮兩道膩子粉,這樣即可避免在打磨時會磨破底而產(chǎn)生的脫層現(xiàn)象服球。
1. After the previous construction is completed, the time interval is too long due to other reasons that cannot be completed in one go, or due to humid weather, rainy season, water, and other reasons; It is recommended to apply two layers of putty powder during the subsequent construction to avoid delamination caused by grinding the bottom.
2茴恰、批刮起后一道時應(yīng)注意不要壓的太實,需打磨的墻面不能收光斩熊,將表面的針孔琐簇、刀痕收平即可,若遇潮濕天氣座享、雨季應(yīng)暫停作業(yè),等天氣好轉(zhuǎn)時方可作業(yè)似忧。如已批刮完后一道時遇到潮濕天氣渣叛、下雨的應(yīng)隔天隨即打磨丈秩,避免因墻面表膜吸水回硬而產(chǎn)生的打磨脫層現(xiàn)象。
2. When scraping the last layer in batches, attention should be paid not to press too tightly. The wall surface that needs to be polished should not be polished, and the surface pinholes and knife marks can be flattened. In case of damp weather or rainy season, work should be suspended until the weather improves. If encountering wet weather or rain after the batch scraping is completed, it should be polished immediately the next day to avoid the phenomenon of polishing and delamination caused by the water absorption and hardening of the wall surface film.
03
03
打磨難
Difficult to polish
產(chǎn)生原因
Cause of occurrence
1淳衙、施工時壓的太實或拋光的墻面較難打磨蘑秽,因為施工時壓的太實或拋光會使膩子粉層的密度增加,墻面較結(jié)實表面的硬度也會提高箫攀。
1. Walls that are pressed too tightly or polished during construction are difficult to polish, as pressing too tightly or polishing during construction can increase the density of the putty layer and increase the hardness of the sturdy surface of the wall.
2肠牲、后一道批刮完較久未打磨的或遇水的如:(潮濕天氣、雨季筷穿、墻面滲水等)墻面較難打磨厌棵,慢干型膩子粉的產(chǎn)品特點是:一個月后硬度方能達(dá)到佳,如遇水會加速其硬化效果牧赚,上述的兩種情況是使墻面硬度增加所以較難打磨醇票,打磨完的墻面較為粗糙。
2. The latter batch of putty powder is difficult to polish walls that have not been polished for a long time or have encountered water, such as humid weather, rainy season, wall seepage, etc. The characteristic of the slow drying putty powder product is that it takes one month to achieve optimal hardness. If it encounters water, it will accelerate its hardening effect. The above two situations increase the hardness of the wall surface, making it difficult to polish, and the polished wall surface is relatively rough.
3淆膏、膩子粉的配方種類不同速郑,而混用在一起,或配方的比例調(diào)配失誤肴士,使產(chǎn)品批刮完后的硬度較高(如:內(nèi)溃皮、外墻膩子粉混用等)。
3. The formula types of putty powder are different, but they are mixed together or the proportion of the formula is adjusted incorrectly, resulting in higher hardness of the product after scraping in batches (such as mixing inner and outer wall putty powder, etc.).
處理方法
processing method
如遇壓的太實或拋光較硬的墻面需要打磨應(yīng)先用150#的砂紙粗磨一下再用400#的砂紙修紋或再批刮一至二道后再打磨丸臀。
If a wall that is too compacted or hard to polish needs to be polished, it should be roughly ground with 150 # sandpaper first, and then trimmed with 400 # sandpaper or scraped one or two times before polishing.
膩子粉針孔熬皮、脫層、打磨難問題的處理相關(guān)事項就講解到這里了聪僚,希望能夠給您好的幫助吧坦辟,更多事項就來我們網(wǎng)站http://www.bjtsdc.com中咨詢!
That's all for dealing with the issues of putty powder pinholes, delamination, and difficulty in polishing. We hope you can be helpful. For more information, please come to our website http://www.bjtsdc.com Consulting!