1、圖紙?jiān)O(shè)計(jì)選擇密度18 - 22公斤/立方米保溫板,通過眾議院批準(zhǔn)的材料和合格的檢查機(jī)構(gòu),在保溫材料質(zhì)量密度現(xiàn)場測量方式驗(yàn)收,定期或在建設(shè)的過程中聚苯板密度測量抽查,防止施工單位在施工過程中以次充好的行為兑蹦。
1. For the design of drawings, 18-22kg / m3 insulation board shall be selected, which shall be accepted by the material and qualified inspection organization approved by the house of representatives in the field measurement of the quality and density of insulation materials, and checked by the density measurement of polystyrene board regularly or in the process of construction, so as to prevent the construction unit's behavior of shoddy in the process of construction.
2. 保溫材料由系統(tǒng)材料供應(yīng)商配套提供钧宠,充分發(fā)揮粘結(jié)劑男窿、保溫板、耐堿玻纖網(wǎng)布瑟曲、抹灰砂漿的整體效果饮戳。
2. The thermal insulation materials shall be provided by the system material supplier to give full play to the overall effect of binder, thermal insulation board, alkali resistant glass fiber mesh and plastering mortar.
3,盡量選擇正規(guī)施工企業(yè)的綜合實(shí)力,開發(fā)人員可以為材料支付預(yù)付款,建設(shè)單位必須事先定制的保溫板,以確保保溫板保溫施工前有足夠的老化時(shí)間,防止保溫板在墻上繼續(xù)萎縮。
3. Try to choose the comprehensive strength of formal construction enterprises. Developers can pay in advance for materials. The construction unit must customize the insulation board in advance to ensure that the insulation board has enough aging time before construction and prevent the insulation board from shrinking on the wall.
4测蹲、將聚苯板糊固定好后莹捡,糊的強(qiáng)度要符合要求鬼吵,及時(shí)做好抹灰層,避免因溫度過高而導(dǎo)致板面面糊曝光時(shí)間過長篮赢。
4. After the polystyrene board paste is fixed, the paste strength shall meet the requirements, and the plastering layer shall be made in time to avoid too long exposure time of the board paste due to too high temperature.
5. 基礎(chǔ)與粘結(jié)劑之間的抗拉結(jié)合強(qiáng)度不得低于0.3mpa齿椅,粘結(jié)界面的脫粘面積不得大于50%。
5. The tensile bond strength between the foundation and the binder shall not be less than 0.3MPa, and the debonding area of the bonding interface shall not be greater than 50%.
6. 所使用的外墻保溫系統(tǒng)材料應(yīng)符合相關(guān)行業(yè)標(biāo)準(zhǔn)的要求启泣,如《膨脹聚苯板薄抹灰外墻保溫系統(tǒng)》(jg149 -2003)和《外墻保溫工程技術(shù)規(guī)程》(JGJ 144-2004)涣脚。
6. The materials used for external wall thermal insulation system shall meet the requirements of relevant industry standards, such as expanded polystyrene board thin plastering external wall thermal insulation system (jg149-2003) and technical specification for external wall thermal insulation engineering (JGJ 144-2004).
以上是濟(jì)南抹面砂漿廠家為大家介紹的相關(guān)內(nèi)容,想要了解更多內(nèi)容寥茫,歡迎訪問網(wǎng)站:http://www.bjtsdc.com
The above is the relevant content introduced by Jinan plastering mortar manufacturer. To learn more, please visit the website: http://www.bjtsdc.com