With the improvement of our economic level, urban construction is also developing continuously, and there are more and more requirements for the types of buildings. Among them, the use of plastering mortar is indispensable. The following plastering mortar is analyzed for your reference.
1瓤檐、基材表面潔凈牢固赂韵,清除砌塊表面的灰塵、油脂距帅、顆粒等一切影響粘結(jié)性能的松散物右锨。
1. The surface of the base material shall be clean and firm, and all loose matters affecting the bonding performance such as dust, grease and particles on the block surface shall be removed.
2、施工前碌秸,普通磚绍移、空心磚應(yīng)提前澆水濕潤(rùn),含水率宜為10~15%尖蚪;灰砂磚啤盯,粉煤灰磚含水率宜為5~8%讯翎。待砌塊表面無明水后,才能進(jìn)行砌筑工序抬而。
2. Before construction, ordinary bricks and hollow bricks shall be watered and wetted in advance, and the moisture content should be 10 ~ 15%; The moisture content of lime sand brick and fly ash brick should be 5 ~ 8%. When there is no open water on the block surface, the masonry process can be carried out.
3最勤、粉刷砂漿應(yīng)隨拌隨用,不得將粉刷砂漿放在水中浸泡墓老,應(yīng)采用機(jī)械拌合坚矢。
3. The plastering mortar shall be used as soon as it is mixed. The plastering mortar shall not be soaked in water, but shall be mixed mechanically.
4、拌和粉刷砂漿的水必須用潔凈水辽蚀,灰水比1:0.12(使用1000公斤砂漿翁纵,配120公斤潔凈水),拌合時(shí)間自投料完畢算起攪拌3~5分鐘泳落。讓砂漿與水充分拌和至沒有結(jié)團(tuán)塊狀為止沐恨,即可施工。
4. Clean water must be used for mixing and painting mortar, with cement water ratio of 1:0.12 (1000 kg mortar and 120 kg clean water). The mixing time is 3 ~ 5 minutes from the completion of feeding. Allow the mortar and water to be fully mixed until there is no agglomeration.
抹面砂漿
Plastering mortar
5婚被、用鋸齒鏝刀將砌筑砂漿滿批在砌塊的砌筑面上狡忙,施工厚度5mm~10mm即可。
5. Fully batch the masonry mortar on the masonry surface of the block with a serrated trowel, and the construction thickness is 5mm ~ 10mm.
6址芯、砌塊砌筑完畢后灾茁,應(yīng)立即清除砌塊表面多余的漿料。
6. After the masonry of the block is completed, the excess slurry on the block surface shall be removed immediately.
7是复、如施工期間高氣溫超過30℃删顶,則調(diào)好的漿料必須在拌成后3小時(shí)內(nèi)使用完畢。
7. If the high temperature exceeds 30 ℃ during construction, the prepared slurry must be used within 3 hours after mixi