氣溫逐漸開(kāi)始高升宛办,已經(jīng)進(jìn)入了盛夏化威,小編整理了一些關(guān)于夏天批刮膩?zhàn)臃廴菀壮霈F(xiàn)的問(wèn)題,看完之后記得要整理要點(diǎn)并規(guī)避起來(lái)属荤。
The temperature is gradually starting to rise, and it has entered the peak of summer. The editor has compiled some questions about the problems that may occur when applying putty powder in batches in summer. After reading them, remember to organize the key points and avoid them.
1
one
干得快
dry fast
Jinan putty powder dries quickly when mixed in barrels, making it difficult to construct. After scraping, it loses water quickly, and cannot be compressed properly or dried too quickly after construction.
原因:施工環(huán)境氣溫太高,濕度太低耀里、通風(fēng)太強(qiáng)及陽(yáng)光直曬蜈缤,膩?zhàn)臃壑械膹?fù)合材料反應(yīng)加速。
Reason: The temperature in the construction environment is too high, the humidity is too low, the ventilation is too strong, and the direct sunlight accelerates the reaction of the composite materials in the putty powder.
解決方案:預(yù)防為主冯挎,注意施工環(huán)境底哥,避免在高溫時(shí)段、陽(yáng)光直曬時(shí)段施工房官,控制施工場(chǎng)地通風(fēng)強(qiáng)度趾徽。當(dāng)基面出現(xiàn)太過(guò)干燥、 吸水快的情況時(shí)建議刷涂界面劑或者預(yù)先濕潤(rùn)基面(但不能有明水)再施工翰守。
Solution: Prevention first, pay attention to the construction environment, avoid construction during high temperature and direct sunlight periods, and control the ventilation intensity of the construction site. When the base surface becomes too dry or absorbs water quickly, it is recommended to brush the interface agent or wet the base surface in advance (but without clear water) before construction.
2
two
批刮翻卷孵奶、卷皮
Batch scraping, flipping, and peeling
膩?zhàn)臃墼谂巍⑹諌簳r(shí)出現(xiàn)翹起或呈鱗片現(xiàn)象蜡峰。
The putty powder shows tilting or scaling during batch scraping and pressing.
原因:基面太干燥或施工現(xiàn)場(chǎng)溫度太高了袁。
Reason: The base surface is too dry or the construction site temperature is too high.
解決方案:基層太干燥時(shí)應(yīng)保濕施工,避開(kāi)中午這種高溫時(shí)段施工湿颅。而針對(duì)批刮已翻皮的膩?zhàn)臃蹜?yīng)該鏟除膩?zhàn)臃墼芈蹋匦屡巍?/div>
Solution: When the base layer is too dry, it should be moisturized during construction, avoiding high temperature periods such as noon. For the putty powder that has been peeled and scraped in batches, the putty powder should be removed and scraped again.
![濟(jì)南膩?zhàn)臃? src=]()
3
three
起泡
Bubbling
膩?zhàn)臃叟螘r(shí)產(chǎn)生氣泡或者批刮過(guò)后表面起泡。
Bubbles are generated during the batch scraping of putty powder or the surface blisters after the batch scraping.
原因:夏季氣溫高斟策, 基層過(guò)于干燥致使膩?zhàn)臃劭旄裳衅纾瑥亩a(chǎn)生氣泡。
Reason: In summer, the temperature is high, and the base layer is too dry, causing the putty powder to dry quickly, resulting in bubbles.
解決方案:膩?zhàn)臃壅{(diào)配時(shí)應(yīng)按要求充分?jǐn)嚢韬担谶m宜溫度范圍施工氧悦。如若批刮時(shí)膩?zhàn)臃塾袣馀菘稍诒砀蓵r(shí)反復(fù)收壓,消除氣泡母烘。
Solution: When mixing putty powder, it should be thoroughly mixed as required and constructed within the appropriate temperature range. If there are bubbles in the putty powder during batch scraping, it can be repeatedly compressed while the surface is dry to eliminate the bubbles.
4
four
掉粉国享、脫層
Powder shedding and delamination
施工完成及干透后侈兄,用手觸摸有掉粉現(xiàn)象,嚴(yán)重的甚至出現(xiàn)前后兩道膩?zhàn)臃壑g或膩?zhàn)臃叟c基底之間相互剝離闺撩。
After the construction is completed and dried thoroughly, there is a phenomenon of powder falling when touched by hand, and in severe cases, there may even be peeling between the two layers of putty powder or between the putty powder and the substrate.
原因:膩?zhàn)臃墼诟邷馗稍飼r(shí)施工饺斧,水分揮發(fā)快,沒(méi)有足夠水分進(jìn)行固化娩鬼,因而容易脫粉。而底層膩?zhàn)臃凼杷煞刍瘒?yán)重继射,面層膩?zhàn)臃厶灿逗校稍锾鞎?huì)造成脫層。另外,外墻膩?zhàn)臃郾挥晁疀_刷后顽聂,粘結(jié)劑流失肥惭,重批后也容易脫層。
Reason: Putty powder is applied at high temperatures and dryness, causing rapid moisture evaporation and insufficient moisture for solidification, making it easy to peel off the powder. And the bottom layer putty powder is loose and severely powdery, while the surface layer putty powder is too hard and dries too quickly, which can cause delamination. In addition, after the external wall putty powder is washed away by rainwater, the adhesive is lost, and it is also easy to delaminate after re approval.
解決方案:膩?zhàn)臃壅{(diào)配時(shí)應(yīng)按要求充分?jǐn)嚢栉商拢谶m宜溫度范圍施工蜜葱。如若批刮時(shí)膩?zhàn)臃塾袣馀菘稍诒砀蓵r(shí)反復(fù)收壓,消除氣泡耀石。
Solution: When mixing putty powder, it should be thoroughly mixed as required and constructed within the appropriate temperature range. If there are bubbles in the putty powder during batch scraping, it can be repeatedly compressed while the surface is dry to eliminate the bubbles.
夏季牵囤,膩?zhàn)臃蹜?yīng)該注意防通風(fēng)過(guò)強(qiáng)、防太陽(yáng)直曬滞伟、防高溫時(shí)段施工揭鳞,注意了這些其實(shí)夏季也不失為一個(gè)批膩?zhàn)臃鄣暮眉竟?jié)。同時(shí)梆奈,高溫季節(jié)施工野崇,工人防中暑的工作也要做好。更多相關(guān)事項(xiàng)就來(lái)我們網(wǎng)站
http://www.bjtsdc.com咨詢(xún)亩钟!
In summer, putty powder should be prevented from excessive ventilation, direct sunlight, and construction during high temperature periods. It should be noted that summer is actually a good season for putty powder batch. At the same time, during the hot season of construction, workers should also do a good job in preventing heatstroke. For more related matters, come to our website http://www.bjtsdc.com consulting service